Vis enkel innførsel

dc.contributor.authorPenz, Louise
dc.contributor.authorDauzère-Pérès, Stéphane
dc.contributor.authorNattaf, Margaux
dc.date.accessioned2023-09-22T12:51:21Z
dc.date.available2023-09-22T12:51:21Z
dc.date.created2022-12-18T22:24:11Z
dc.date.issued2022
dc.identifier.citationComputers & Operations Research. 2022, 151 106092-?.en_US
dc.identifier.issn0305-0548
dc.identifier.urihttps://hdl.handle.net/11250/3091410
dc.description.abstractThis paper is motivated by the development of Industry 4.0 and the need to better integrate production and maintenance decisions. Our problem considers a single machine on which jobs of different families are scheduled to minimize the sum of completion times. The machine has a health index which decreases when jobs are processed. To restore the machine health, maintenance operations must be scheduled. Moreover, to be scheduled, each job requires the machine to have a minimum health index which depends on the job family. Two cases are studied: (1) The daily case with a single flexible maintenance operation, and (2) The weekly case with two flexible maintenance operations. The second case is shown to be NP-complete. Two Mixed Integer Linear Programming models are presented for each case. The first model uses ‘‘classical’’ positional variables, while the second model improves the first model by using the notion of master sequence. Different valid inequalities are also proposed. Computational experiments show that the second model is much more efficient than the first model when solved with a standard solver, and the impact of the valid inequalities is discussed.en_US
dc.description.abstractMinimizing the sum of completion times on a single machine with health index and flexible maintenance operationsen_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.subjectSingle-machine schedulingen_US
dc.subjectFlexible maintenanceen_US
dc.subjectMachine health indexen_US
dc.subjectMathematical programmingen_US
dc.subjectMaster sequenceen_US
dc.titleMinimizing the sum of completion times on a single machine with health index and flexible maintenance operationsen_US
dc.title.alternativeMinimizing the sum of completion times on a single machine with health index and flexible maintenance operationsen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionsubmittedVersionen_US
dc.rights.holderElsevieren_US
dc.source.pagenumber106092-?en_US
dc.source.volume151en_US
dc.source.journalComputers & Operations Researchen_US
dc.identifier.doi10.1016/j.cor.2022.106092
dc.identifier.cristin2094859
cristin.ispublishedtrue
cristin.fulltextpreprint
cristin.qualitycode2


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal