• norsk
    • English
  • norsk 
    • norsk
    • English
  • Logg inn
Vis innførsel 
  •   Hjem
  • Handelshøyskolen BI
  • Publikasjoner fra CRIStin - BI
  • Vis innførsel
  •   Hjem
  • Handelshøyskolen BI
  • Publikasjoner fra CRIStin - BI
  • Vis innførsel
JavaScript is disabled for your browser. Some features of this site may not work without it.

Is integration of Uncertainty Management and The Last Planner System a good idea?

Torp, Olav; Bølviken, Trond; Aslesen, Sigmund; Lombardo, Sebastiano
Chapter
Accepted version
Thumbnail
Åpne
Torp et al. 2018.pdf (401.3Kb)
Permanent lenke
http://hdl.handle.net/11250/2582609
Utgivelsesdato
2018
Metadata
Vis full innførsel
Samlinger
  • Publikasjoner fra CRIStin - BI [633]
  • Scientific articles [1667]
Originalversjon
26th Annual Conference of the International Group for Lean Construction - Chennai, India - 2018   https://doi.org/10.24928/2018/0218
Sammendrag
The Last Planner System (LPS) is a tool for project planning and control, and is an important contribution from Lean Construction. LPS focuses on scheduling, task coordination and time management. Uncertainty Management (UM) is a key element in Project Management, where uncertainty is the totality of opportunities (potential upsides) and risks (potential downsides). UM addresses all types of uncertainty (related to cost, time, quality, scope, safety, customer satisfaction, company reputation, etc.). The aim of UM is to exploit the opportunities and reduce the risks. Two construction companies involved in this research are working with both LPS and UM. One has extensive experience with LPS, but less experience with UM. The other has extensive experience with UM, but less experience with LPS. Two questions are raised and discussed in the paper: 1. Could project planning and control be improved by an integration of LPS and UM? 2. If yes, how could LPS and UM be integrated to improve project planning and control? The paper proposes a conceptual model where UM tools are integrated in the plan and meeting structure of LPS. The model is to be tested in forthcoming case studies.
Utgiver
IGLC

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit
 

 

Bla i

Hele arkivetDelarkiv og samlingerUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifterDenne samlingenUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifter

Min side

Logg inn

Statistikk

Besøksstatistikk

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit