• Multiobjective Optimization for Complex Flexible Job-Shop Scheduling Problems 

      Tamssaouet, Karim; Dauzère-Pérès, Stéphane; Knopp, Sebastian; Bitar, Abdoul; Yugma, Claude (Journal article; Peer reviewed, 2021)
      In this paper, we are concerned with the resolution of a multiobjective complex job-shop scheduling problem stemming from semiconductor manufacturing. To produce feasible and industrially meaningful schedules, this paper ...
    • Parallel Machine Scheduling with Time Constraints on Machine Qualifications 

      Nattaf, Margaux; Dauzère-Pérès, Stéphane; Yugma, Claude; Wu, Cheng-Hung (Journal article; Peer reviewed, 2019)
      This paper studies the scheduling of jobs of different families on parallel machines, where not all machines are qualified (eligible) to process all job families. Originating from semiconductor manufacturing, an important ...
    • Performance evaluation of single and multi-class production systems using an approximating queuing network 

      Mohammadi, Mehrdad; Dauzère-Pérès, Stéphane; Yugma, Claude (Journal article; Peer reviewed, 2018)
      Performance evaluation, and in particular cycle time estimation, is critical to optimise production plans in high-tech manufacturing industries. This paper develops a new aggregation model based on queuing network, so-called ...
    • Solving a real-life multi-skill resource-constrained multi-project scheduling problem 

      Torba, Rahman; Dauzère-Pérès, Stéphane; Yugma, Claude; Gallais, Cédric; Pouzet, Juliette (Journal article; Peer reviewed, 2024)
      This paper addresses a multi-skill resource-constrained multi-project scheduling problem (MSRCMPSP) with different types of resources and complex industrial constraints, which originates from SNCF heavy maintenance factories. ...
    • Unrelated parallel machine scheduling with new criteria: Complexity and models 

      Bitar, Abdoul; Dauzère-Pérès, Stéphane; Yugma, Claude (Journal article; Peer reviewed, 2021)
      In this paper, a scheduling problem on non-identical parallel machines with auxiliary resources and sequence-dependent and machine-dependent setup times is studied. This problem can be found in various manufacturing contexts, ...